Recent work.
Jobs from the last few weeks, with the street, the trade and how long each one actually took.
-
Heating & cooling — Fairbank Road — Two days
Two-storey heat pump, no ductwork
Four ductless heads replaced electric baseboard, and the winter bill dropped by a third.
-
Plumbing — Oak Row — One day
Kitchen re-pipe after a slab leak
Copper rerouted through the ceiling instead of breaking the slab, and the cabinets stayed.
-
Electrical — Colliers Mill — One day
Panel upgrade to 200 amp
Every circuit labelled, permit pulled, and the town inspection passed the same afternoon.
-
Repairs & handyman — Wrenfield — Half a day
The whole fridge list, in one visit
Eleven small jobs, from a sticking back door to a deck rail that had gone soft.
What the neighbours say.
4.9 across 312 reviews
-
The furnace quit on the coldest night of the year. Someone picked up at eleven, a van was here by seven, and we had heat before the school run.
Dana R.
Heating & cooling — Oak Row
-
They found the leak with a meter instead of a sledgehammer, gave me the price in writing first, and the floor went back exactly as it was.
Marcus T.
Plumbing — Fairbank Road
-
I had a list of nine things I had been ignoring for two years. They did eight in an afternoon and told me honestly that the ninth needed a specialist.
Priya S.
Repairs & handyman — Colliers Mill
Something in the house needs looking at.
Call and a person picks up, or send the details and we will come back with a window today.