Fort Worth, TX Booking roof checks this week
A roof ready for the next storm.
Ridge replaces, repairs, and storm-proofs roofs across Tarrant County. Free roof checks, photos of everything we find, and most new roofs finished in one day.
4.9 from 612 Google reviews
Roof report Done
Ryan Place
Full replacement after the June 14 hail
- Roof size
- 28 squares
- On site
- 1 day
Storm log June 14, 2026 · 4:52 pm
Hail came through on June 14. We were on 214 roofs by the 17th.
Every storm that crosses our service area gets logged: where the hail fell, how big it was, and which roofs we checked after. If your street is inside the swath, your roof is worth a look.
- Largest hail
- 1.75 in
- Peak gusts
- 62 mph
- Roofs we checked
- 214
- Claims approved
- 171
Hail size
- 0.25 in Pea
- 0.75 in Penny
- 1.00 in Quarter
- 1.75 in Golf ball
- 2.75 in Baseball
- 0.25 in
- 0.75 in
- 1.00 in
- 1.75 in
- 2.75 in
Everything above the ceiling.
One crew for the whole roof: shingles, metal, flashing, gutters, and the attic air underneath.
-
Roof replacement
Most homes: 1 day
Full tear-off to the deck, new underlayment, and a new roof — usually finished in one day.
-
Leak and roof repair
Same week
Missing shingles, lifted flashing, a stain on the ceiling. Found, photographed, and fixed.
-
Hail and storm damage
Within 48 hours
A free inspection with photos of every hit, and a crew lead who meets your adjuster on the roof.
-
Metal roofing
2–3 days
Standing-seam steel in twelve colours. Class 4 hail rated and good for fifty years.
-
Gutters and ventilation
Half a day
Seamless gutters, ridge vents, and attic airflow that keeps shingles from cooking in August.
What goes on your roof.
Shingles are the part you see. The layers under them decide whether the next storm reaches your ceiling.
Tap a layer to find it in the drawing.
Recent roofs.
Every job gets a roof report: the neighbourhood, the material, the size, and how long we were there.
-
Berkeley Place · June 14 hail · 1.75 in
Brick colonial after the June hail
- Material
- Class 4 shingles
- Size
- 32 squares
- On site
- 1 day
-
Aledo · Planned replacement
Standing-seam metal on a farmhouse
- Material
- Standing-seam steel
- Size
- 41 squares
- On site
- 3 days
-
Fairmount · Historic district review
Cedar shake on a Fairmount cottage
- Material
- Cedar shake
- Size
- 18 squares
- On site
- 4 days
What the neighbours say.
4.9 across 612 Google reviews
-
They were on our roof two days after the June hail, circled every hit, and handled the adjuster. New roof went on in one day.
Dana Whitfield · Ryan Place
-
Three companies told us we needed a new roof. Ridge fixed the flashing around the chimney for a fraction and the leak is gone.
Sam Ortega · Arlington Heights
-
The yard was cleaner when they left than when they came. They even ran a magnet over the driveway twice.
Jordan Price · Tanglewood